Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Percolation Tank
52 works
₹3.14 Cr sanctioned
₹2.76 Cr spent (88%)
02
Construction of Check Dam/Stop Dam
79 works
₹1.68 Cr sanctioned
₹1.31 Cr spent (78%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
11 works
₹1.06 Cr sanctioned
₹25.13 L spent (24%)
04
Construction of Road and Culvert
13 works
₹76.82 L sanctioned
₹58.27 L spent (76%)
05
Construction of Well
37 works
₹67.11 L sanctioned
₹61.63 L spent (92%)
06
Plantation
21 works
₹55.13 L sanctioned
₹34.66 L spent (63%)
07
Rural Housing
178 works
₹38.21 L sanctioned
₹34.58 L spent (91%)
08
Construction of Tank
7 works
₹33.32 L sanctioned
₹25.10 L spent (75%)
09
Construction of Bund
10 works
₹13.99 L sanctioned
₹12.11 L spent (87%)
10
Construction of Recharge Pits
7 works
₹13.42 L sanctioned
₹8.14 L spent (61%)