Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
34 works
₹1.96 Cr sanctioned
₹1.51 Cr spent (77%)
02
Construction of Percolation Tank
23 works
₹1.07 Cr sanctioned
₹64.17 L spent (60%)
03
Construction of Road and Culvert
7 works
₹44.97 L sanctioned
₹29.20 L spent (65%)
04
Construction of Trench
16 works
₹42.34 L sanctioned
₹27.57 L spent (65%)
05
Construction of Well
19 works
₹34.30 L sanctioned
₹28.84 L spent (84%)
06
Culvert
2 works
₹32.00 L sanctioned
₹31.36 L spent (98%)
07
Construction of Tank
6 works
₹31.37 L sanctioned
₹16.13 L spent (51%)
08
Repair & maint of Water Harvesting Structures
5 works
₹28.00 L sanctioned
₹27.14 L spent (97%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹27.60 L sanctioned
₹24.05 L spent (87%)
10
Plantation
9 works
₹22.56 L sanctioned
₹4.22 L spent (19%)