Showcase — Completed Works
Rollup last refreshed: 2026-08-27 14:06:46.546602
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
38 works
₹1.88 Cr sanctioned
₹1.70 Cr spent (91%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
21 works
₹1.13 Cr sanctioned
₹90.23 L spent (80%)
03
Construction of Road and Culvert
11 works
₹1.07 Cr sanctioned
₹91.64 L spent (86%)
04
Construction of Percolation Tank
13 works
₹83.28 L sanctioned
₹73.08 L spent (88%)
05
Construction of Well
47 works
₹81.43 L sanctioned
₹69.46 L spent (85%)
06
Terracing
12 works
₹79.49 L sanctioned
₹57.13 L spent (72%)
07
Construction of Trench
14 works
₹75.63 L sanctioned
₹62.38 L spent (82%)
08
Cattle Shed
39 works
₹37.38 L sanctioned
₹32.95 L spent (88%)
09
Plantation
14 works
₹34.12 L sanctioned
₹12.37 L spent (36%)
10
Rural Housing
130 works
₹21.45 L sanctioned
₹20.89 L spent (97%)