Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹1.36 Cr sanctioned
₹1.35 Cr spent (99%)
02
Construction of Well
43 works
₹1.30 Cr sanctioned
₹1.28 Cr spent (98%)
03
Construction of Percolation Tank
32 works
₹59.54 L sanctioned
₹47.28 L spent (79%)
04
Cattle Shed
21 works
₹51.32 L sanctioned
₹49.51 L spent (96%)
05
Construction of Check Dam/Stop Dam
13 works
₹50.33 L sanctioned
₹46.01 L spent (91%)
06
Rural Housing
259 works
₹45.45 L sanctioned
₹44.66 L spent (98%)
07
Constr of Cement Concrete Roads
27 works
₹43.55 L sanctioned
₹42.16 L spent (97%)
08
Farm Pond
16 works
₹35.71 L sanctioned
₹31.59 L spent (88%)
09
Construction of Trench
11 works
₹19.98 L sanctioned
₹32.35 L spent (162%)
10
Repair & Maint of Check Dam/Stop Dam
2 works
₹18.08 L sanctioned
₹17.19 L spent (95%)