Showcase — Completed Works
Rollup last refreshed: 2026-08-27 14:06:46.546602
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
84 works
₹2.38 Cr sanctioned
₹2.22 Cr spent (93%)
02
Construction of Tank
8 works
₹1.36 Cr sanctioned
₹1.24 Cr spent (91%)
03
Construction of Road and Culvert
14 works
₹1.33 Cr sanctioned
₹1.35 Cr spent (102%)
04
Construction of Check Dam/Stop Dam
11 works
₹1.09 Cr sanctioned
₹1.00 Cr spent (92%)
05
Farm Pond
88 works
₹1.01 Cr sanctioned
₹69.19 L spent (69%)
06
Constr of Cement Concrete Roads
19 works
₹94.70 L sanctioned
₹60.65 L spent (64%)
07
Construction of Percolation Tank
63 works
₹89.27 L sanctioned
₹65.57 L spent (73%)
08
Construction of Trench
10 works
₹79.17 L sanctioned
₹72.50 L spent (92%)
09
Terracing
7 works
₹71.03 L sanctioned
₹70.42 L spent (99%)
10
Rural Housing
382 works
₹66.69 L sanctioned
₹57.86 L spent (87%)