Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
24 works
₹61.58 L sanctioned
₹57.68 L spent (94%)
02
Constr of Cement Concrete Roads
13 works
₹48.31 L sanctioned
₹45.57 L spent (94%)
03
Rural Housing
251 works
₹47.59 L sanctioned
₹45.47 L spent (96%)
04
Farm Pond
16 works
₹35.94 L sanctioned
₹28.14 L spent (78%)
05
Construction of Road and Culvert
4 works
₹25.71 L sanctioned
₹16.78 L spent (65%)
06
Construction of Check Dam/Stop Dam
6 works
₹15.32 L sanctioned
₹14.24 L spent (93%)
07
Works for Flood Control and Protection
2 works
₹9.79 L sanctioned
₹5.53 L spent (56%)
08
Repair & maint of Pond/ Tank
1 works
₹9.76 L sanctioned
₹6.06 L spent (62%)
09
Construction of Percolation Tank
4 works
₹8.01 L sanctioned
₹6.28 L spent (78%)
10
Repair & maint of Water Harvesting Structures
1 works
₹7.85 L sanctioned
₹4.38 L spent (56%)