Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
250 works
₹34.09 Cr sanctioned
₹1.39 Cr spent (4%)
02
Farm Pond
78 works
₹1.07 Cr sanctioned
₹77.23 L spent (72%)
03
Construction of Bund
61 works
₹1.04 Cr sanctioned
₹74.88 L spent (72%)
04
Rural Housing
430 works
₹82.28 L sanctioned
₹78.02 L spent (95%)
05
Construction of Well
22 works
₹73.37 L sanctioned
₹60.50 L spent (82%)
06
Plantation
23 works
₹59.46 L sanctioned
₹35.95 L spent (60%)
07
Construction of Road and Culvert
9 works
₹59.15 L sanctioned
₹49.69 L spent (84%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
9 works
₹48.44 L sanctioned
₹38.10 L spent (79%)
09
Construction of Percolation Tank
6 works
₹46.67 L sanctioned
₹35.98 L spent (77%)
10
Works for Flood Control and Protection
14 works
₹36.34 L sanctioned
₹30.16 L spent (83%)