Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
114 works
₹10.82 Cr sanctioned
₹60.40 L spent (6%)
02
Construction of Road and Culvert
13 works
₹2.35 Cr sanctioned
₹59.94 L spent (26%)
03
Construction of Bund
230 works
₹2.09 Cr sanctioned
₹1.78 Cr spent (85%)
04
Farm Pond
198 works
₹1.57 Cr sanctioned
₹1.19 Cr spent (76%)
05
Land Development
40 works
₹1.20 Cr sanctioned
₹92.79 L spent (77%)
06
Rural Housing
434 works
₹77.58 L sanctioned
₹68.29 L spent (88%)
07
Boulder Check/Gully Plug
24 works
₹52.08 L sanctioned
₹41.44 L spent (80%)
08
Construction of Trench
67 works
₹41.01 L sanctioned
₹33.22 L spent (81%)
09
Repair & maint of Pond/ Tank
3 works
₹23.69 L sanctioned
₹20.58 L spent (87%)
10
Deepening / Desilting of Flood Channels
4 works
₹17.58 L sanctioned
₹11.15 L spent (63%)