Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
147 works
₹11.05 Cr sanctioned
₹1.39 Cr spent (13%)
02
Deepening / Desilting of Flood Channels
6 works
₹4.70 Cr sanctioned
₹25.08 L spent (5%)
03
Culvert
2 works
₹3.32 Cr sanctioned
₹5.67 L spent (2%)
04
Farm Pond
87 works
₹1.53 Cr sanctioned
₹1.32 Cr spent (86%)
05
Construction of Trench
88 works
₹1.15 Cr sanctioned
₹14.78 L spent (13%)
06
Construction of Bund
110 works
₹70.96 L sanctioned
₹54.31 L spent (77%)
07
Rural Housing
405 works
₹70.29 L sanctioned
₹68.19 L spent (97%)
08
Construction of Road and Culvert
9 works
₹36.66 L sanctioned
₹28.20 L spent (77%)
09
Construction of Well
14 works
₹28.69 L sanctioned
₹17.58 L spent (61%)
10
Solid and Liquid Waste Management
14 works
₹21.11 L sanctioned
₹16.79 L spent (80%)