Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
164 works
₹33.41 Cr sanctioned
₹64.69 L spent (2%)
02
Culvert
2 works
₹3.34 Cr sanctioned
₹9.67 L spent (3%)
03
Construction of Bund
187 works
₹2.08 Cr sanctioned
₹1.70 Cr spent (81%)
04
Farm Pond
95 works
₹1.87 Cr sanctioned
₹1.42 Cr spent (76%)
05
Construction of Road and Culvert
18 works
₹1.49 Cr sanctioned
₹1.20 Cr spent (81%)
06
Rural Housing
285 works
₹55.21 L sanctioned
₹45.31 L spent (82%)
07
Repair & maint of Pond/ Tank
4 works
₹30.51 L sanctioned
₹29.42 L spent (96%)
08
Plantation
7 works
₹23.90 L sanctioned
₹5.04 L spent (21%)
09
Construction of Trench
4 works
₹12.64 L sanctioned
₹8.90 L spent (70%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹12.37 L sanctioned
₹8.85 L spent (71%)