Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
149 works
₹32.32 Cr sanctioned
₹1.04 Cr spent (3%)
02
Farm Pond
145 works
₹2.76 Cr sanctioned
₹2.24 Cr spent (81%)
03
Construction of Bund
98 works
₹1.65 Cr sanctioned
₹67.65 L spent (41%)
04
Rural Housing
398 works
₹73.47 L sanctioned
₹64.80 L spent (88%)
05
Construction of Well
16 works
₹48.95 L sanctioned
₹37.67 L spent (77%)
06
Construction of Trench
13 works
₹42.71 L sanctioned
₹23.18 L spent (54%)
07
Other Works
7 works
₹40.99 L sanctioned
₹37.00 L spent (90%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
65 works
₹40.78 L sanctioned
₹34.50 L spent (85%)
09
Construction of Road and Culvert
3 works
₹40.24 L sanctioned
₹27.90 L spent (69%)
10
Plantation
16 works
₹26.89 L sanctioned
₹12.36 L spent (46%)