Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
11 works
₹11.37 Cr sanctioned
₹30.45 L spent (3%)
02
Construction of Check Dam/Stop Dam
105 works
₹8.76 Cr sanctioned
₹83.83 L spent (10%)
03
Deepening / Desilting of Flood Channels
4 works
₹5.58 Cr sanctioned
₹9.50 L spent (2%)
04
Farm Pond
136 works
₹2.52 Cr sanctioned
₹1.97 Cr spent (78%)
05
Construction of Bund
231 works
₹1.85 Cr sanctioned
₹1.57 Cr spent (85%)
06
Works for Flood Control and Protection
4 works
₹1.32 Cr sanctioned
₹11.25 L spent (9%)
07
Solid and Liquid Waste Management
90 works
₹1.09 Cr sanctioned
₹83.78 L spent (77%)
08
Rural Housing
335 works
₹61.87 L sanctioned
₹55.88 L spent (90%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
35 works
₹31.48 L sanctioned
₹25.32 L spent (80%)
10
Plantation
14 works
₹27.46 L sanctioned
₹8.76 L spent (32%)