Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
182 works
₹26.48 Cr sanctioned
₹1.19 Cr spent (5%)
02
Construction of Road and Culvert
8 works
₹6.20 Cr sanctioned
₹60.47 L spent (10%)
03
Construction of Bund
207 works
₹2.37 Cr sanctioned
₹2.04 Cr spent (86%)
04
Farm Pond
85 works
₹1.55 Cr sanctioned
₹1.22 Cr spent (79%)
05
Rural Housing
306 works
₹55.37 L sanctioned
₹53.77 L spent (97%)
06
Construction of Well
22 works
₹48.66 L sanctioned
₹38.13 L spent (78%)
07
Construction of Trench
6 works
₹31.85 L sanctioned
₹20.57 L spent (65%)
08
Land Development
8 works
₹30.44 L sanctioned
₹27.08 L spent (89%)
09
Repair & maint of Water Harvesting Structures
6 works
₹28.07 L sanctioned
₹24.36 L spent (87%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
41 works
₹26.05 L sanctioned
₹19.44 L spent (75%)