Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹2.43 Cr sanctioned
₹1.23 Cr spent (51%)
02
Construction of Check Dam/Stop Dam
4 works
₹1.32 Cr sanctioned
₹1.35 Cr spent (102%)
03
Construction of Road and Culvert
13 works
₹1.06 Cr sanctioned
₹72.57 L spent (68%)
04
Construction of Percolation Tank
6 works
₹76.53 L sanctioned
₹59.81 L spent (78%)
05
Constr of Cement Concrete Roads
10 works
₹58.16 L sanctioned
₹51.14 L spent (88%)
06
Farm Pond
10 works
₹33.79 L sanctioned
₹25.99 L spent (77%)
07
Repair & maint of Pond/ Tank
4 works
₹20.08 L sanctioned
₹10.99 L spent (55%)
08
Repair & Maint of Check Dam/Stop Dam
2 works
₹16.79 L sanctioned
₹9.74 L spent (58%)
09
Land Development
24 works
₹16.17 L sanctioned
₹9.34 L spent (58%)
10
Construction of Trench
2 works
₹14.31 L sanctioned
₹6.37 L spent (45%)