Showcase — Completed Works
Rollup last refreshed: 2026-08-26 17:54:53.293656
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Renovation of traditional water bodies
6 works
₹3.01 Cr sanctioned
₹1.49 Cr spent (50%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹1.32 Cr sanctioned
₹12.10 L spent (9%)
03
Boulder Check/Gully Plug
1 works
₹1.31 Cr sanctioned
₹1.02 Cr spent (78%)
04
Construction of Road and Culvert
9 works
₹46.20 L sanctioned
₹31.81 L spent (69%)
05
Land Development
25 works
₹34.60 L sanctioned
₹33.20 L spent (96%)
06
Constr of Cement Concrete Roads
13 works
₹25.45 L sanctioned
₹23.18 L spent (91%)
07
Construction of Check Dam/Stop Dam
5 works
₹22.01 L sanctioned
₹15.53 L spent (71%)
08
Construction of Trench
2 works
₹16.12 L sanctioned
₹13.67 L spent (85%)
09
Plantation
4 works
₹14.38 L sanctioned
₹4.63 L spent (32%)
10
Construction of Percolation Tank
2 works
₹14.16 L sanctioned
₹11.67 L spent (82%)