Showcase — Completed Works
Rollup last refreshed: 2026-09-07 07:03:15.513604
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Goat Shelter
3 works
₹4.78 Cr sanctioned
₹2.00 L spent (0%)
02
Construction of Check Dam/Stop Dam
14 works
₹77.60 L sanctioned
₹79.78 L spent (103%)
03
Construction of Fish Drying Infrastructure
9 works
₹37.06 L sanctioned
₹33.54 L spent (91%)
04
Construction of Well
13 works
₹35.81 L sanctioned
₹30.08 L spent (84%)
05
Construction of Bund
49 works
₹34.55 L sanctioned
₹30.23 L spent (88%)
06
Works for Flood Control and Protection
3 works
₹18.46 L sanctioned
₹17.02 L spent (92%)
07
Rural Housing
97 works
₹18.37 L sanctioned
₹17.75 L spent (97%)
08
Repair & maint of Percolation Tank
2 works
₹18.07 L sanctioned
₹14.60 L spent (81%)
09
Farm Pond
21 works
₹16.16 L sanctioned
₹17.19 L spent (106%)
10
Plantation
6 works
₹14.52 L sanctioned
₹9.29 L spent (64%)