Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
47 works
₹3.11 Cr sanctioned
₹2.62 Cr spent (84%)
02
Construction of Bund
86 works
₹2.22 Cr sanctioned
₹1.81 Cr spent (81%)
03
Farm Pond
103 works
₹1.57 Cr sanctioned
₹1.36 Cr spent (87%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
18 works
₹1.26 Cr sanctioned
₹99.08 L spent (79%)
05
Construction of Trench
10 works
₹1.19 Cr sanctioned
₹1.07 Cr spent (89%)
06
Land Development
150 works
₹1.04 Cr sanctioned
₹90.27 L spent (87%)
07
Rural Housing
406 works
₹70.63 L sanctioned
₹71.18 L spent (101%)
08
Construction of Check Dam/Stop Dam
51 works
₹69.67 L sanctioned
₹58.98 L spent (85%)
09
Plantation
21 works
₹41.46 L sanctioned
₹29.24 L spent (71%)
10
Construction of Percolation Tank
5 works
₹38.61 L sanctioned
₹30.73 L spent (80%)