MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
46,757
Sanctioned (pure scheme)
₹467.21 Cr
Expenditure since inception
₹303.94 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
6,464 works
₹120.19 Cr sanctioned
₹24.60 Cr spent (20%)
02
Construction of Road and Culvert
1,535 works
₹48.26 Cr sanctioned
₹64.33 Cr spent (133%)
03
Construction of Check Dam/Stop Dam
1,934 works
₹44.62 Cr sanctioned
₹16.51 Cr spent (37%)
04
Rural Housing
21,955 works
₹39.99 Cr sanctioned
₹39.68 Cr spent (99%)
05
Works for Flood Control and Protection
679 works
₹34.04 Cr sanctioned
₹26.51 Cr spent (78%)
06
Farm Pond
1,913 works
₹32.74 Cr sanctioned
₹13.31 Cr spent (41%)
07
Construction of Tank
391 works
₹18.45 Cr sanctioned
₹15.70 Cr spent (85%)
08
Constr of Cement Concrete Roads
1,733 works
₹15.82 Cr sanctioned
₹11.68 Cr spent (74%)
09
Land Development
1,513 works
₹14.11 Cr sanctioned
₹12.09 Cr spent (86%)
10
Repair & maint of Pond/ Tank
195 works
₹13.39 Cr sanctioned
₹10.59 Cr spent (79%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 21,955 39.99 39.68
99%
2 Construction of Bund 6,464 120.19 24.60
21%
3 Construction of Toilets 2,556 5.29 3.83
72%
4 Construction of Check Dam/Stop Dam 1,934 44.62 16.51
37%
5 Farm Pond 1,913 32.74 13.31
41%
6 Constr of Cement Concrete Roads 1,733 15.82 11.68
74%
7 Construction of Trench 1,649 5.18 10.02
193%
8 Construction of Road and Culvert 1,535 48.26 64.33
133%
9 Land Development 1,513 14.11 12.09
86%
10 Construction of NADEP/Vermi Compost Pit 817 2.10 1.68
80%
11 Plantation 791 12.79 5.93
46%
12 Works for Flood Control and Protection 679 34.04 26.51
78%
13 Solid and Liquid Waste Management 506 2.26 1.87
82%
14 Construction of Tank 391 18.45 15.70
85%
15 Cattle Shed 295 2.30 2.07
90%
16 Goat Shelter 221 1.22 1.04
85%
17 Repair & maint of Pond/ Tank 195 13.39 10.59
79%
18 Construction of Fish Drying Infrastructure 158 6.24 5.22
84%
19 Construction of Well 157 2.43 1.48
61%
20 Fish Culture 141 7.12 6.22
87%
21 Well Recharge 87 0.61 0.46
76%
22 Construction of Percolation Tank 85 4.16 3.51
84%
23 Roof Water Harvesting on gov/panchayat bldg 83 0.05 0.04
87%
24 Deepening / Desilting of Flood Channels 79 4.50 3.50
78%
25 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 60 1.68 1.44
85%
26 Repair & Maint of Fish Drying Infrastructure 58 2.11 1.98
94%
27 Renovation of traditional water bodies 54 3.17 2.47
78%
28 Community Sanitary Complex 51 0.28 0.27
95%
29 Culvert 50 2.65 2.21
84%
30 Construction of Recharge Pits 41 0.40 0.34
83%
31 Repair & Maint of Community infrastructure 41 0.15 0.15
100%
32 Other Works 39 0.37 0.29
78%
33 Construction of Play field 39 1.22 1.33
109%
34 Construction of Crematorium 37 1.07 0.71
66%
35 Constr of Kitchen Shed 31 0.06 0.05
75%
36 Construction of building/workshed for SHG 30 1.48 1.36
92%
37 Constr of Food Grain storage 28 2.59 2.53
98%
38 Repair & maint of Road 27 0.63 0.56
90%
39 Constr of Aganwadi 26 0.83 0.70
85%
40 Constr of GP Bhawan 22 0.79 0.60
76%
41 Poultry Shelter 21 0.11 0.10
94%
42 Boulder Check/Gully Plug 18 3.83 0.16
4%
43 Construction of Embankment 17 0.63 0.47
75%
44 Repair & Maint of Bund 14 0.62 0.44
71%
45 Terracing 14 0.25 0.19
76%
46 Nursery Development 12 0.28 0.13
46%
47 Underground Dyke for Ground Water Recharge 11 0.35 0.33
94%
48 Construction of Canal 10 0.90 0.93
103%
49 Repair & maint of Water Harvesting Structures 9 0.46 0.35
76%
50 Repair & Maint of Canal 9 0.60 0.53
89%
51 Repaire and Maint of NADEP/Vermi Compost Pit 9 0.02 0.01
79%
52 Repair & Maint of Check Dam/Stop Dam 6 0.11 0.08
76%
53 Renovation of Canal 6 0.26 0.22
86%
54 Repair & maint of Percolation Tank 5 0.38 0.32
83%
55 Construction of Other Community Building/Assets 5 0.15 0.13
87%
56 Grass Land Development 4 0.17 0.13
80%
57 Constr of Compound wall 3 0.08 0.07
90%
58 Bio-Fertilizer 3 0.02 0.02
89%
59 Construction of Spur 3 0.22 0.20
90%
60 Strengthening of Embankment 2 0.18 0.17
94%
61 Construction of Village Haats 2 0.08 0.06
75%
62 Constr of Gabion 2 0.09 0.02
22%
63 Lining of Canal 1 0.03 0.02
89%
Total 46,757 467.21 303.94
All 63 rows (zero-value rows hidden) ⇩ Export to Excel