Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
43 works
₹3.68 Cr sanctioned
₹3.44 Cr spent (93%)
02
Constr of Cement Concrete Roads
27 works
₹2.13 Cr sanctioned
₹2.15 Cr spent (101%)
03
Construction of Road and Culvert
23 works
₹1.53 Cr sanctioned
₹1.51 Cr spent (99%)
04
Construction of Trench
13 works
₹1.01 Cr sanctioned
₹92.51 L spent (91%)
05
Construction of Check Dam/Stop Dam
32 works
₹90.97 L sanctioned
₹1.28 Cr spent (140%)
06
Construction of Bund
5 works
₹59.29 L sanctioned
₹45.21 L spent (76%)
07
Land Development
66 works
₹44.85 L sanctioned
₹50.88 L spent (113%)
08
Cattle Shed
32 works
₹27.48 L sanctioned
₹24.29 L spent (88%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹24.97 L sanctioned
₹24.78 L spent (99%)
10
Repair & maint of Road
2 works
₹22.96 L sanctioned
₹22.37 L spent (97%)