MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
58,092
Sanctioned (pure scheme)
₹854.13 Cr
Expenditure since inception
₹422.81 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
3,970 works
₹285.01 Cr sanctioned
₹46.21 Cr spent (16%)
02
Construction of Road and Culvert
1,835 works
₹122.94 Cr sanctioned
₹81.72 Cr spent (66%)
03
Land Development
7,030 works
₹80.61 Cr sanctioned
₹30.42 Cr spent (38%)
04
Construction of Check Dam/Stop Dam
979 works
₹70.18 Cr sanctioned
₹46.16 Cr spent (66%)
05
Rural Housing
28,339 works
₹51.32 Cr sanctioned
₹50.30 Cr spent (98%)
06
Construction of Trench
254 works
₹42.26 Cr sanctioned
₹31.26 Cr spent (74%)
07
Plantation
4,852 works
₹34.91 Cr sanctioned
₹12.72 Cr spent (36%)
08
Constr of Cement Concrete Roads
1,285 works
₹31.65 Cr sanctioned
₹21.59 Cr spent (68%)
09
Farm Pond
2,443 works
₹21.50 Cr sanctioned
₹15.04 Cr spent (70%)
10
Construction of Bund
1,035 works
₹18.67 Cr sanctioned
₹11.35 Cr spent (61%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 28,339 51.32 50.30
98%
2 Land Development 7,030 80.61 30.42
38%
3 Plantation 4,852 34.91 12.72
36%
4 Construction of Well 3,970 285.01 46.21
16%
5 Farm Pond 2,443 21.50 15.04
70%
6 Construction of Road and Culvert 1,835 122.94 81.72
67%
7 Constr of Cement Concrete Roads 1,285 31.65 21.59
68%
8 Solid and Liquid Waste Management 1,165 2.56 1.89
74%
9 Construction of Toilets 1,096 2.16 1.22
56%
10 Construction of Bund 1,035 18.67 11.35
61%
11 Construction of Check Dam/Stop Dam 979 70.18 46.16
66%
12 Construction of NADEP/Vermi Compost Pit 978 2.08 1.68
81%
13 Construction of Trench 254 42.26 31.26
74%
14 Renovation of traditional water bodies 228 9.47 6.95
74%
15 Construction of Percolation Tank 210 5.19 4.09
79%
16 Cattle Shed 199 3.07 2.36
77%
17 Construction of Tank 198 12.09 10.25
85%
18 Construction of Recharge Pits 177 0.78 0.54
70%
19 Repair & maint of Pond/ Tank 167 7.63 6.48
85%
20 Constr of Gabion 134 10.49 9.21
88%
21 Repair & Maint of Community infrastructure 124 0.85 0.69
82%
22 Culvert 113 1.98 1.65
83%
23 Construction of Crematorium 112 2.80 2.01
72%
24 Well Recharge 111 1.59 1.23
77%
25 Community Sanitary Complex 97 0.42 0.39
93%
26 Works for Flood Control and Protection 85 3.07 2.39
78%
27 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 74 2.11 1.60
76%
28 Construction of Play field 58 4.13 2.96
72%
29 Terracing 56 1.44 1.25
87%
30 Grass Land Development 55 1.80 1.61
89%
31 Constr of Aganwadi 55 0.98 0.89
91%
32 Repair & Maint of Check Dam/Stop Dam 53 2.44 2.24
92%
33 Constr of Compound wall 51 1.50 1.33
89%
34 Constr of GP Bhawan 45 1.22 1.00
82%
35 Roof Water Harvesting on gov/panchayat bldg 40 0.86 0.82
95%
36 Repair & maint of Water Harvesting Structures 38 1.41 1.20
85%
37 Repair & Maint of Bund 35 0.80 0.67
84%
38 Repaire and Maint of NADEP/Vermi Compost Pit 34 0.04 0.03
73%
39 Strengthening of Embankment 33 0.59 0.45
75%
40 Boulder Check/Gully Plug 31 1.75 0.67
38%
41 Repair & maint of Road 25 0.87 0.71
82%
42 Repair & maint of Percolation Tank 23 0.59 0.51
87%
43 Other Works 22 0.30 0.21
69%
44 Goat Shelter 18 0.78 0.73
94%
45 Poultry Shelter 18 0.14 0.11
81%
46 Underground Dyke for Ground Water Recharge 17 1.47 0.84
57%
47 Construction of Embankment 15 1.99 1.91
96%
48 Construction of Spur 13 0.43 0.36
84%
49 Deepening / Desilting of Flood Channels 10 0.13 0.10
79%
50 Constr of Food Grain storage 9 0.37 0.34
92%
51 Bio-Fertilizer 9 0.08 0.06
76%
52 Constr of Kitchen Shed 6 0.04 0.04
91%
53 Nursery Development 6 0.14 0.07
49%
54 Construction of Other Community Building/Assets 5 0.06 0.05
79%
55 Repair & Maint of Canal 3 0.05 0.04
89%
56 Lining of Canal 3 0.02 0.02
94%
57 Piggery Shelter 3 0.03 0.03
95%
58 Construction of building/workshed for SHG 3 0.03 0.03
100%
59 Construction of Fish Drying Infrastructure 2 0.01 0.01
85%
60 Construction of Village Haats 2 0.02 0.02
99%
61 Renovation of Canal 2 0.10 0.05
52%
62 Lift Irrigation 2 0.11 0.07
64%
63 Bio-gas plant 1 0.01 0.01
85%
64 Construction of Canal 1 0.00 0.00
104%
Total 58,092 854.13 422.81
All 64 rows (zero-value rows hidden) ⇩ Export to Excel