Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
3 works
₹33.59 L sanctioned
₹18.74 L spent (56%)
02
Plantation
8 works
₹20.40 L sanctioned
₹12.06 L spent (59%)
03
Constr of Cement Concrete Roads
20 works
₹14.08 L sanctioned
₹12.89 L spent (92%)
04
Constr of GP Bhawan
1 works
₹12.65 L sanctioned
₹10.00 L spent (79%)
05
Terracing
2 works
₹8.59 L sanctioned
₹2.44 L spent (28%)
06
Renovation of traditional water bodies
2 works
₹7.74 L sanctioned
₹5.54 L spent (72%)
07
Construction of Check Dam/Stop Dam
6 works
₹6.26 L sanctioned
₹5.78 L spent (92%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹5.28 L sanctioned
₹5.16 L spent (98%)
09
Construction of Percolation Tank
2 works
₹4.31 L sanctioned
₹3.58 L spent (83%)
10
Repair & maint of Pond/ Tank
2 works
₹4.19 L sanctioned
₹3.06 L spent (73%)