Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
7 works
₹90.55 L sanctioned
₹84.71 L spent (94%)
02
Construction of Percolation Tank
9 works
₹54.65 L sanctioned
₹46.37 L spent (85%)
03
Construction of Well
14 works
₹49.62 L sanctioned
₹49.14 L spent (99%)
04
Works for Flood Control and Protection
12 works
₹41.27 L sanctioned
₹39.91 L spent (97%)
05
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹36.10 L sanctioned
₹33.67 L spent (93%)
06
Constr of Cement Concrete Roads
27 works
₹27.72 L sanctioned
₹19.49 L spent (70%)
07
Repair & maint of Pond/ Tank
5 works
₹15.81 L sanctioned
₹13.64 L spent (86%)
08
Plantation
9 works
₹14.95 L sanctioned
₹8.29 L spent (55%)
09
Farm Pond
4 works
₹12.62 L sanctioned
₹11.22 L spent (89%)
10
Construction of Check Dam/Stop Dam
4 works
₹11.00 L sanctioned
₹9.83 L spent (89%)