Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
5 works
₹50.21 L sanctioned
₹31.33 L spent (62%)
02
Construction of Well
19 works
₹43.07 L sanctioned
₹35.34 L spent (82%)
03
Plantation
14 works
₹23.80 L sanctioned
₹14.66 L spent (62%)
04
Constr of Cement Concrete Roads
32 works
₹22.92 L sanctioned
₹17.36 L spent (76%)
05
Rural Housing
123 works
₹21.69 L sanctioned
₹21.50 L spent (99%)
06
Construction of Percolation Tank
5 works
₹18.71 L sanctioned
₹12.87 L spent (69%)
07
Repair & maint of Pond/ Tank
1 works
₹13.92 L sanctioned
₹11.56 L spent (83%)
08
Works for Flood Control and Protection
4 works
₹12.59 L sanctioned
₹11.70 L spent (93%)
09
Construction of Check Dam/Stop Dam
1 works
₹9.57 L sanctioned
₹9.52 L spent (99%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹6.36 L sanctioned
₹6.33 L spent (100%)