Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
53 works
₹1.58 Cr sanctioned
₹1.39 Cr spent (88%)
02
Works for Flood Control and Protection
15 works
₹1.08 Cr sanctioned
₹98.87 L spent (91%)
03
Construction of Road and Culvert
6 works
₹60.62 L sanctioned
₹40.58 L spent (67%)
04
Construction of Tank
5 works
₹42.11 L sanctioned
₹39.28 L spent (93%)
05
Constr of Cement Concrete Roads
40 works
₹40.11 L sanctioned
₹32.87 L spent (82%)
06
Construction of Check Dam/Stop Dam
4 works
₹39.84 L sanctioned
₹39.10 L spent (98%)
07
Cattle Shed
1 works
₹37.85 L sanctioned
₹37.79 L spent (100%)
08
Construction of Trench
4 works
₹22.95 L sanctioned
₹13.61 L spent (59%)
09
Farm Pond
53 works
₹22.78 L sanctioned
₹22.26 L spent (98%)
10
Construction of Percolation Tank
3 works
₹22.51 L sanctioned
₹20.29 L spent (90%)