Showcase — Completed Works
Rollup last refreshed: 2026-10-01 08:37:11.749328
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
11 works
₹1.08 Cr sanctioned
₹68.82 L spent (64%)
02
Works for Flood Control and Protection
12 works
₹95.33 L sanctioned
₹83.86 L spent (88%)
03
Constr of Cement Concrete Roads
37 works
₹40.58 L sanctioned
₹23.41 L spent (58%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹40.34 L sanctioned
₹35.86 L spent (89%)
05
Rural Housing
180 works
₹31.77 L sanctioned
₹31.42 L spent (99%)
06
Construction of Check Dam/Stop Dam
6 works
₹26.80 L sanctioned
₹25.06 L spent (94%)
07
Construction of Tank
2 works
₹18.39 L sanctioned
₹18.16 L spent (99%)
08
Construction of Well
7 works
₹14.40 L sanctioned
₹12.09 L spent (84%)
09
Construction of Percolation Tank
4 works
₹13.78 L sanctioned
₹12.90 L spent (94%)
10
Constr of GP Bhawan
1 works
₹12.85 L sanctioned
₹10.73 L spent (84%)