Showcase — Completed Works
Rollup last refreshed: 2026-10-14 07:05:44.899714
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
19 works
₹1.45 Cr sanctioned
₹62.47 L spent (43%)
02
Construction of Percolation Tank
25 works
₹94.86 L sanctioned
₹75.96 L spent (80%)
03
Construction of Check Dam/Stop Dam
16 works
₹92.81 L sanctioned
₹84.14 L spent (91%)
04
Rural Housing
481 works
₹82.71 L sanctioned
₹67.96 L spent (82%)
05
Construction of Well
46 works
₹48.00 L sanctioned
₹34.74 L spent (72%)
06
Repair & maint of Pond/ Tank
3 works
₹24.03 L sanctioned
₹18.66 L spent (78%)
07
Repair & maint of Water Harvesting Structures
6 works
₹22.96 L sanctioned
₹18.70 L spent (81%)
08
Construction of Trench
5 works
₹22.51 L sanctioned
₹11.76 L spent (52%)
09
Repair & Maint of Check Dam/Stop Dam
11 works
₹20.21 L sanctioned
₹19.14 L spent (95%)
10
Constr of Cement Concrete Roads
11 works
₹15.44 L sanctioned
₹19.65 L spent (127%)