Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
10 works
₹1.98 Cr sanctioned
₹1.88 Cr spent (95%)
02
Construction of Well
62 works
₹1.41 Cr sanctioned
₹1.18 Cr spent (83%)
03
Works for Flood Control and Protection
3 works
₹30.69 L sanctioned
₹27.64 L spent (90%)
04
Plantation
17 works
₹29.78 L sanctioned
₹4.35 L spent (15%)
05
Repair & maint of Pond/ Tank
3 works
₹23.91 L sanctioned
₹15.64 L spent (65%)
06
Construction of Percolation Tank
4 works
₹17.92 L sanctioned
₹12.39 L spent (69%)
07
Rural Housing
103 works
₹17.84 L sanctioned
₹17.17 L spent (96%)
08
Terracing
3 works
₹17.10 L sanctioned
₹14.22 L spent (83%)
09
Construction of Check Dam/Stop Dam
4 works
₹11.18 L sanctioned
₹9.43 L spent (84%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹9.83 L sanctioned
₹4.68 L spent (48%)