Showcase — Completed Works
Rollup last refreshed: 2026-08-27 14:06:46.546602
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
9 works
₹91.70 L sanctioned
₹88.82 L spent (97%)
02
Plantation
16 works
₹37.73 L sanctioned
₹14.12 L spent (37%)
03
Construction of Well
17 works
₹24.95 L sanctioned
₹26.47 L spent (106%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹21.20 L sanctioned
₹17.29 L spent (82%)
05
Rural Housing
86 works
₹15.21 L sanctioned
₹14.77 L spent (97%)
06
Construction of Percolation Tank
1 works
₹7.24 L sanctioned
₹6.28 L spent (87%)
07
Repair & maint of Water Harvesting Structures
1 works
₹6.91 L sanctioned
₹5.45 L spent (79%)
08
Renovation of traditional water bodies
2 works
₹5.58 L sanctioned
₹5.10 L spent (91%)
09
Construction of Toilets
117 works
₹5.15 L sanctioned
₹3.70 L spent (72%)
10
Works for Flood Control and Protection
1 works
₹4.81 L sanctioned
₹5.38 L spent (112%)