Showcase — Completed Works
Rollup last refreshed: 2026-10-13 07:05:51.512495
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
6 works
₹1.40 Cr sanctioned
₹38.11 L spent (27%)
02
Construction of Trench
10 works
₹82.53 L sanctioned
₹60.80 L spent (74%)
03
Rural Housing
259 works
₹42.70 L sanctioned
₹41.69 L spent (98%)
04
Terracing
3 works
₹24.97 L sanctioned
₹20.99 L spent (84%)
05
Plantation
4 works
₹20.91 L sanctioned
₹4.86 L spent (23%)
06
Repair & maint of Pond/ Tank
2 works
₹19.63 L sanctioned
₹11.91 L spent (61%)
07
Construction of Check Dam/Stop Dam
4 works
₹19.54 L sanctioned
₹6.37 L spent (33%)
08
Constr of Cement Concrete Roads
12 works
₹17.75 L sanctioned
₹10.34 L spent (58%)
09
Repair & maint of Water Harvesting Structures
2 works
₹16.78 L sanctioned
₹12.00 L spent (71%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹16.02 L sanctioned
₹14.00 L spent (87%)