Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
24 works
₹1.69 Cr sanctioned
₹1.23 Cr spent (73%)
02
Construction of Trench
22 works
₹1.66 Cr sanctioned
₹1.39 Cr spent (84%)
03
Construction of Road and Culvert
12 works
₹1.65 Cr sanctioned
₹66.00 L spent (40%)
04
Construction of Check Dam/Stop Dam
10 works
₹94.33 L sanctioned
₹71.82 L spent (76%)
05
Rural Housing
432 works
₹75.85 L sanctioned
₹74.75 L spent (99%)
06
Plantation
26 works
₹57.40 L sanctioned
₹24.21 L spent (42%)
07
Constr of Gabion
3 works
₹36.06 L sanctioned
₹31.28 L spent (87%)
08
Repair & maint of Pond/ Tank
5 works
₹32.10 L sanctioned
₹27.05 L spent (84%)
09
Construction of Percolation Tank
13 works
₹30.31 L sanctioned
₹27.71 L spent (91%)
10
Repair & maint of Water Harvesting Structures
4 works
₹29.49 L sanctioned
₹20.51 L spent (70%)