Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
16 works
₹2.94 Cr sanctioned
₹1.33 Cr spent (45%)
02
Construction of Trench
14 works
₹1.19 Cr sanctioned
₹91.43 L spent (77%)
03
Construction of Percolation Tank
10 works
₹75.18 L sanctioned
₹56.40 L spent (75%)
04
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
11 works
₹73.05 L sanctioned
₹45.36 L spent (62%)
05
Plantation
19 works
₹61.69 L sanctioned
₹6.50 L spent (11%)
06
Rural Housing
360 works
₹57.69 L sanctioned
₹57.30 L spent (99%)
07
Poultry Shelter
34 works
₹47.94 L sanctioned
₹47.16 L spent (98%)
08
Construction of Well
29 works
₹47.18 L sanctioned
₹40.30 L spent (85%)
09
Construction of Bund
9 works
₹44.88 L sanctioned
₹23.63 L spent (53%)
10
Construction of Check Dam/Stop Dam
19 works
₹42.61 L sanctioned
₹31.89 L spent (75%)