Showcase — Completed Works
Rollup last refreshed: 2026-08-23 08:31:42.168333
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
14 works
₹1.87 Cr sanctioned
₹83.79 L spent (45%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
16 works
₹1.06 Cr sanctioned
₹71.63 L spent (68%)
03
Construction of Trench
10 works
₹76.89 L sanctioned
₹59.71 L spent (78%)
04
Plantation
22 works
₹68.06 L sanctioned
₹12.33 L spent (18%)
05
Repair & maint of Pond/ Tank
11 works
₹62.67 L sanctioned
₹48.04 L spent (77%)
06
Construction of Check Dam/Stop Dam
9 works
₹57.76 L sanctioned
₹50.22 L spent (87%)
07
Rural Housing
330 works
₹55.97 L sanctioned
₹56.52 L spent (101%)
08
Construction of Percolation Tank
3 works
₹33.29 L sanctioned
₹23.28 L spent (70%)
09
Farm Pond
22 works
₹31.74 L sanctioned
₹10.14 L spent (32%)
10
Constr of Aganwadi
2 works
₹21.78 L sanctioned
₹13.30 L spent (61%)