Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
11 works
₹1.50 Cr sanctioned
₹85.79 L spent (57%)
02
Construction of Bund
20 works
₹98.71 L sanctioned
₹67.04 L spent (68%)
03
Rural Housing
578 works
₹97.44 L sanctioned
₹97.15 L spent (100%)
04
Construction of Trench
12 works
₹96.23 L sanctioned
₹81.96 L spent (85%)
05
Construction of Check Dam/Stop Dam
7 works
₹91.56 L sanctioned
₹56.70 L spent (62%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
11 works
₹74.15 L sanctioned
₹55.17 L spent (74%)
07
Plantation
17 works
₹63.62 L sanctioned
₹11.99 L spent (19%)
08
Construction of Embankment
8 works
₹59.75 L sanctioned
₹44.68 L spent (75%)
09
Construction of Percolation Tank
5 works
₹52.90 L sanctioned
₹39.13 L spent (74%)
10
Boulder Check/Gully Plug
10 works
₹48.04 L sanctioned
₹31.52 L spent (66%)