Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:49:07.017331
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
109 works
₹10.02 Cr sanctioned
₹1.21 Cr spent (12%)
02
Construction of Percolation Tank
28 works
₹2.38 Cr sanctioned
₹12.47 L spent (5%)
03
Construction of Trench
23 works
₹2.23 Cr sanctioned
₹1.96 Cr spent (88%)
04
Construction of Road and Culvert
20 works
₹1.22 Cr sanctioned
₹95.56 L spent (78%)
05
Rural Housing
522 works
₹1.07 Cr sanctioned
₹99.27 L spent (93%)
06
Plantation
25 works
₹83.68 L sanctioned
₹63.34 L spent (76%)
07
Boulder Check/Gully Plug
5 works
₹46.98 L sanctioned
₹40.30 L spent (86%)
08
Farm Pond
73 works
₹30.82 L sanctioned
₹20.46 L spent (66%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹29.22 L sanctioned
₹26.02 L spent (89%)
10
Construction of Bund
63 works
₹26.97 L sanctioned
₹21.12 L spent (78%)