Showcase — Completed Works
Rollup last refreshed: 2026-10-16 08:36:19.743515
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
39 works
₹1.59 Cr sanctioned
₹1.04 Cr spent (66%)
02
Construction of Percolation Tank
3 works
₹1.37 Cr sanctioned
₹1.71 L spent (1%)
03
Construction of Check Dam/Stop Dam
135 works
₹1.09 Cr sanctioned
₹1.05 Cr spent (96%)
04
Construction of Road and Culvert
12 works
₹76.58 L sanctioned
₹51.19 L spent (67%)
05
Rural Housing
383 works
₹71.97 L sanctioned
₹69.23 L spent (96%)
06
Construction of Trench
9 works
₹53.19 L sanctioned
₹39.45 L spent (74%)
07
Farm Pond
68 works
₹40.30 L sanctioned
₹33.98 L spent (84%)
08
Repair & maint of Water Harvesting Structures
5 works
₹35.40 L sanctioned
₹32.41 L spent (92%)
09
Boulder Check/Gully Plug
3 works
₹25.13 L sanctioned
₹22.96 L spent (91%)
10
Construction of Play field
3 works
₹21.20 L sanctioned
₹13.20 L spent (62%)