Showcase — Completed Works
Rollup last refreshed: 2026-08-25 08:55:11.826995
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
58 works
₹5.43 Cr sanctioned
₹4.53 Cr spent (83%)
02
Construction of Bund
34 works
₹2.13 Cr sanctioned
₹1.87 Cr spent (88%)
03
Construction of Check Dam/Stop Dam
50 works
₹1.98 Cr sanctioned
₹1.75 Cr spent (88%)
04
Construction of Road and Culvert
23 works
₹1.75 Cr sanctioned
₹1.02 Cr spent (58%)
05
Farm Pond
121 works
₹1.55 Cr sanctioned
₹68.03 L spent (44%)
06
Plantation
40 works
₹1.27 Cr sanctioned
₹1.00 Cr spent (79%)
07
Rural Housing
449 works
₹87.47 L sanctioned
₹83.71 L spent (96%)
08
Construction of Tank
5 works
₹81.47 L sanctioned
₹58.08 L spent (71%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹76.58 L sanctioned
₹73.11 L spent (95%)
10
Construction of Well
26 works
₹66.75 L sanctioned
₹41.74 L spent (63%)