Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
170 works
₹2.78 Cr sanctioned
₹2.12 Cr spent (76%)
02
Construction of Road and Culvert
17 works
₹1.69 Cr sanctioned
₹1.21 Cr spent (72%)
03
Farm Pond
68 works
₹1.39 Cr sanctioned
₹1.16 Cr spent (83%)
04
Construction of Bund
66 works
₹1.07 Cr sanctioned
₹88.41 L spent (83%)
05
Land Development
189 works
₹80.23 L sanctioned
₹70.79 L spent (88%)
06
Rural Housing
415 works
₹77.80 L sanctioned
₹74.26 L spent (95%)
07
Constr of Gabion
42 works
₹72.41 L sanctioned
₹67.01 L spent (93%)
08
Poultry Shelter
58 works
₹60.03 L sanctioned
₹54.33 L spent (91%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹49.00 L sanctioned
₹66.01 L spent (135%)
10
Construction of Tank
3 works
₹38.76 L sanctioned
₹36.31 L spent (94%)