Showcase — Completed Works
Rollup last refreshed: 2026-09-01 08:48:19.512575
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
28 works
₹3.26 Cr sanctioned
₹2.58 Cr spent (79%)
02
Construction of Well
40 works
₹1.12 Cr sanctioned
₹93.98 L spent (84%)
03
Construction of Check Dam/Stop Dam
38 works
₹74.75 L sanctioned
₹50.21 L spent (67%)
04
Construction of Trench
7 works
₹36.71 L sanctioned
₹22.72 L spent (62%)
05
Constr of Cement Concrete Roads
22 works
₹34.59 L sanctioned
₹30.12 L spent (87%)
06
Rural Housing
200 works
₹33.98 L sanctioned
₹32.00 L spent (94%)
07
Cattle Shed
6 works
₹30.47 L sanctioned
₹30.31 L spent (99%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
14 works
₹24.19 L sanctioned
₹15.89 L spent (66%)
09
Construction of Percolation Tank
4 works
₹18.07 L sanctioned
₹13.19 L spent (73%)
10
Repair & maint of Road
2 works
₹17.32 L sanctioned
₹5.95 L spent (34%)