Showcase — Completed Works
Rollup last refreshed: 2026-08-19 08:32:20.978731
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
37 works
₹3.31 Cr sanctioned
₹2.71 Cr spent (82%)
02
Works for Flood Control and Protection
23 works
₹3.06 Cr sanctioned
₹2.21 Cr spent (72%)
03
Construction of Road and Culvert
30 works
₹3.01 Cr sanctioned
₹2.59 Cr spent (86%)
04
Construction of Check Dam/Stop Dam
4 works
₹35.52 L sanctioned
₹22.11 L spent (62%)
05
Repair & maint of Road
1 works
₹34.33 L sanctioned
₹30.90 L spent (90%)
06
Repair & maint of Water Harvesting Structures
2 works
₹29.61 L sanctioned
₹23.24 L spent (78%)
07
Construction of Bund
3 works
₹28.67 L sanctioned
₹25.18 L spent (88%)
08
Construction of Recharge Pits
19 works
₹26.37 L sanctioned
₹19.23 L spent (73%)
09
Repair & maint of Pond/ Tank
2 works
₹24.49 L sanctioned
₹21.80 L spent (89%)
10
Terracing
2 works
₹23.14 L sanctioned
₹21.08 L spent (91%)