| Sr. | New Work Type | Completed | Sanctioned | Expenditure | Exp. % |
|---|---|---|---|---|---|
| 1 | Construction of Toilets | 59 | 0.00 | 0.02 | 2767% |
| 2 | Rural Housing | 46 | 0.07 | 0.07 | 98% |
| 3 | Works for Flood Control and Protection | 31 | 4.12 | 3.90 | 95% |
| 4 | Constr of Cement Concrete Roads | 24 | 0.12 | 0.12 | 98% |
| 5 | Construction of Road and Culvert | 11 | 0.89 | 0.79 | 89% |
| 6 | Plantation | 10 | 0.51 | 0.37 | 73% |
| 7 | Construction of Well | 9 | 0.06 | 0.03 | 40% |
| 8 | Construction of Check Dam/Stop Dam | 7 | 0.15 | 0.14 | 93% |
| 9 | Construction of Water Drain/Diversion Channel/Drainage/Field Channel | 6 | 0.30 | 0.26 | 86% |
| 10 | Construction of NADEP/Vermi Compost Pit | 6 | 0.18 | 0.16 | 90% |
| 11 | Farm Pond | 5 | 0.09 | 0.06 | 67% |
| 12 | Construction of Trench | 3 | 0.39 | 0.33 | 86% |
| 13 | Deepening / Desilting of Flood Channels | 3 | 0.11 | 0.10 | 87% |
| 14 | Community Sanitary Complex | 1 | 0.00 | 0.00 | 51% |
| 15 | Repair & maint of Water Harvesting Structures | 1 | 0.01 | 0.01 | 91% |
| 16 | Constr of GP Bhawan | 1 | 0.14 | 0.09 | 61% |
| 17 | Construction of Percolation Tank | 1 | 0.12 | 0.10 | 78% |
| 18 | Constr of Aganwadi | 1 | 0.02 | 0.01 | 26% |
| Total | 225 | 7.30 | 6.54 |