Scope
Works completed
277
Sanctioned (pure scheme)
₹4.64 Cr
Expenditure since inception
₹3.74 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
38 works
₹1.30 Cr sanctioned
₹93.88 L spent (72%)
02
Construction of Percolation Tank
9 works
₹65.85 L sanctioned
₹58.92 L spent (89%)
03
Construction of Road and Culvert
6 works
₹58.11 L sanctioned
₹41.61 L spent (72%)
04
Construction of Tank
4 works
₹42.51 L sanctioned
₹41.85 L spent (98%)
05
Rural Housing
156 works
₹26.28 L sanctioned
₹25.07 L spent (95%)
06
Culvert
4 works
₹24.81 L sanctioned
₹22.46 L spent (91%)
07
Constr of Cement Concrete Roads
20 works
₹21.78 L sanctioned
₹19.19 L spent (88%)
08
Construction of Well
9 works
₹21.31 L sanctioned
₹18.38 L spent (86%)
09
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹16.97 L sanctioned
₹14.24 L spent (84%)
10
Repair & maint of Pond/ Tank
2 works
₹14.17 L sanctioned
₹13.25 L spent (94%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 156 0.26 0.25
95%
2 Construction of Check Dam/Stop Dam 38 1.30 0.94
72%
3 Constr of Cement Concrete Roads 20 0.22 0.19
88%
4 Farm Pond 11 0.12 0.09
77%
5 Construction of Well 9 0.21 0.18
86%
6 Construction of Percolation Tank 9 0.66 0.59
90%
7 Construction of Road and Culvert 6 0.58 0.42
72%
8 Plantation 6 0.00 0.00
51%
9 Construction of Tank 4 0.43 0.42
98%
10 Culvert 4 0.25 0.22
91%
11 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 4 0.17 0.14
84%
12 Construction of Recharge Pits 3 0.01 0.00
20%
13 Repair & maint of Pond/ Tank 2 0.14 0.13
94%
14 Land Development 1 0.01 0.00
78%
15 Construction of Play field 1 0.13 0.05
38%
16 Constr of GP Bhawan 1 0.13 0.09
68%
17 Construction of Toilets 1 0.01 0.01
122%
18 Construction of Trench 1 0.02 0.01
65%
Total 277 4.64 3.74