MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-01 08:48:19.512575
to
to
Reset filters
Scope
Works completed
357
Sanctioned (pure scheme)
₹3.50 Cr
Expenditure since inception
₹2.99 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
9 works
₹56.09 L sanctioned
₹48.49 L spent (86%)
02
Construction of Well
25 works
₹54.15 L sanctioned
₹57.31 L spent (106%)
03
Rural Housing
213 works
₹35.50 L sanctioned
₹34.41 L spent (97%)
04
Constr of Cement Concrete Roads
20 works
₹31.76 L sanctioned
₹20.12 L spent (63%)
05
Repair & maint of Pond/ Tank
4 works
₹25.38 L sanctioned
₹21.64 L spent (85%)
06
Culvert
4 works
₹23.30 L sanctioned
₹21.72 L spent (93%)
07
Construction of Check Dam/Stop Dam
3 works
₹17.72 L sanctioned
₹16.37 L spent (92%)
08
Renovation of traditional water bodies
3 works
₹14.94 L sanctioned
₹10.70 L spent (72%)
09
Land Development
14 works
₹13.85 L sanctioned
₹10.12 L spent (73%)
10
Plantation
9 works
₹12.57 L sanctioned
₹6.76 L spent (54%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 213 35.50 34.41
97%
2 Construction of Well 25 54.15 57.31
106%
3 Construction of Toilets 22 3.57 2.93
82%
4 Constr of Cement Concrete Roads 20 31.76 20.12
63%
5 Construction of Bund 15 12.37 10.28
83%
6 Land Development 14 13.85 10.12
73%
7 Construction of Road and Culvert 9 56.09 48.49
87%
8 Plantation 9 12.57 6.76
54%
9 Constr of Gabion 5 7.48 6.30
84%
10 Repair & maint of Pond/ Tank 4 25.38 21.64
85%
11 Culvert 4 23.30 21.72
93%
12 Construction of Check Dam/Stop Dam 3 17.72 16.37
92%
13 Renovation of traditional water bodies 3 14.94 10.70
72%
14 Works for Flood Control and Protection 2 7.11 2.77
39%
15 Construction of Trench 2 6.64 8.41
127%
16 Constr of Food Grain storage 1 8.03 7.75
97%
17 Construction of Play field 1 5.05 4.48
89%
18 Construction of Crematorium 1 6.27 2.82
45%
19 Construction of Percolation Tank 1 0.50 0.06
11%
20 Terracing 1 0.41 0.36
89%
21 Boulder Check/Gully Plug 1 1.99 0.96
48%
22 Construction of Recharge Pits 1 4.99 4.71
95%
Total 357 349.67 299.45
All 22 rows (zero-value rows hidden) ⇩ Export to Excel