MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
2,08,588
Sanctioned (pure scheme)
₹2,087.56 Cr
Expenditure since inception
₹1,691.58 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Bund
4,344 works
₹244.80 Cr sanctioned
₹204.51 Cr spent (84%)
02
Construction of Well
10,803 works
₹240.03 Cr sanctioned
₹193.03 Cr spent (80%)
03
Construction of Road and Culvert
3,080 works
₹237.19 Cr sanctioned
₹167.34 Cr spent (71%)
04
Construction of Check Dam/Stop Dam
3,905 works
₹223.04 Cr sanctioned
₹203.37 Cr spent (91%)
05
Rural Housing
1,26,131 works
₹217.19 Cr sanctioned
₹211.15 Cr spent (97%)
06
Land Development
8,873 works
₹125.53 Cr sanctioned
₹83.99 Cr spent (67%)
07
Plantation
6,483 works
₹125.01 Cr sanctioned
₹65.54 Cr spent (52%)
08
Construction of Trench
1,569 works
₹85.00 Cr sanctioned
₹70.55 Cr spent (83%)
09
Constr of Cement Concrete Roads
6,319 works
₹76.14 Cr sanctioned
₹63.42 Cr spent (83%)
10
Farm Pond
5,166 works
₹68.13 Cr sanctioned
₹53.80 Cr spent (79%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 1,26,131 217.19 211.15
97%
2 Construction of Toilets 13,640 9.00 6.84
76%
3 Construction of Well 10,803 240.03 193.03
80%
4 Land Development 8,873 125.53 83.99
67%
5 Plantation 6,483 125.01 65.54
52%
6 Constr of Cement Concrete Roads 6,319 76.14 63.42
83%
7 Farm Pond 5,166 68.13 53.80
79%
8 Construction of Bund 4,344 244.80 204.51
84%
9 Construction of NADEP/Vermi Compost Pit 3,960 8.17 4.76
58%
10 Construction of Check Dam/Stop Dam 3,905 223.04 203.37
91%
11 Construction of Road and Culvert 3,080 237.19 167.34
71%
12 Goat Shelter 1,706 10.24 9.41
92%
13 Construction of Trench 1,569 85.00 70.55
83%
14 Constr of Gabion 1,559 52.10 46.37
89%
15 Solid and Liquid Waste Management 1,400 16.67 15.35
92%
16 Construction of Recharge Pits 1,354 6.10 4.79
79%
17 Well Recharge 1,044 13.60 11.03
81%
18 Construction of Percolation Tank 1,016 67.92 57.80
85%
19 Repair & maint of Pond/ Tank 717 44.40 38.87
88%
20 Renovation of traditional water bodies 645 17.77 9.08
51%
21 Construction of Crematorium 571 14.96 12.51
84%
22 Cattle Shed 359 8.77 8.37
95%
23 Construction of Tank 359 30.12 26.56
88%
24 Constr of GP Bhawan 330 28.98 22.11
76%
25 Constr of Aganwadi 310 6.78 5.60
83%
26 Construction of Play field 292 13.08 9.17
70%
27 Constr of Compound wall 273 6.27 6.06
97%
28 Culvert 260 7.43 6.37
86%
29 Community Sanitary Complex 229 1.52 0.99
66%
30 Repair & Maint of Check Dam/Stop Dam 178 7.79 7.11
91%
31 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 147 6.78 6.15
91%
32 Boulder Check/Gully Plug 140 3.81 3.24
85%
33 Terracing 134 4.94 4.44
90%
34 Repair & Maint of Bund 132 7.05 6.49
92%
35 Constr of Kitchen Shed 125 0.31 0.26
85%
36 Repair & maint of Water Harvesting Structures 118 3.45 3.20
93%
37 Constr of Food Grain storage 105 8.19 7.85
96%
38 Repair & maint of Percolation Tank 105 8.67 7.49
86%
39 Works for Flood Control and Protection 85 7.10 6.79
96%
40 Repair & maint of Road 78 4.47 4.13
92%
41 Poultry Shelter 78 0.43 0.35
82%
42 Other Works 75 1.07 0.72
67%
43 Repair & Maint of Community infrastructure 56 1.91 1.68
88%
44 Construction of building/workshed for SHG 55 1.08 1.05
97%
45 Construction of Embankment 54 5.67 4.89
86%
46 Nursery Development 41 1.32 0.77
58%
47 Roof Water Harvesting on gov/panchayat bldg 41 1.11 1.05
95%
48 Underground Dyke for Ground Water Recharge 31 1.66 1.13
68%
49 Construction of Spur 26 1.65 1.45
88%
50 Repaire and Maint of NADEP/Vermi Compost Pit 16 0.06 0.05
76%
51 Construction of Other Community Building/Assets 14 0.47 0.44
93%
52 Grass Land Development 10 0.67 0.55
81%
53 Strengthening of Embankment 8 0.30 0.28
95%
54 Construction of Fish Drying Infrastructure 7 0.13 0.09
66%
55 Bio-Fertilizer 7 0.08 0.07
83%
56 Construction of Canal 5 0.20 0.14
67%
57 Renovation of Canal 4 0.33 0.21
65%
58 Repair & maint of Gully Plugs 4 0.40 0.35
86%
59 Deepening / Desilting of Flood Channels 3 0.15 0.12
80%
60 Construction of Village Haats 3 0.17 0.17
97%
61 Lining of Canal 2 0.12 0.12
97%
62 Bio-gas plant 2 0.01 0.00
42%
63 Piggery Shelter 1 0.01 0.01
100%
64 Repair & Maint of Canal 1 0.03 0.03
87%
Total 2,08,588 2,087.56 1,691.58
All 64 rows (zero-value rows hidden) ⇩ Export to Excel