MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
2,10,218
Sanctioned (pure scheme)
₹2,166.56 Cr
Expenditure since inception
₹1,321.69 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
12,159 works
₹632.75 Cr sanctioned
₹243.36 Cr spent (38%)
02
Construction of Road and Culvert
4,545 works
₹263.77 Cr sanctioned
₹173.65 Cr spent (66%)
03
Rural Housing
1,18,283 works
₹213.99 Cr sanctioned
₹202.22 Cr spent (95%)
04
Land Development
21,931 works
₹181.21 Cr sanctioned
₹103.60 Cr spent (57%)
05
Plantation
7,331 works
₹171.49 Cr sanctioned
₹66.39 Cr spent (39%)
06
Farm Pond
8,961 works
₹153.71 Cr sanctioned
₹122.15 Cr spent (79%)
07
Constr of Cement Concrete Roads
5,349 works
₹113.31 Cr sanctioned
₹72.77 Cr spent (64%)
08
Construction of Bund
4,996 works
₹73.26 Cr sanctioned
₹57.20 Cr spent (78%)
09
Construction of Well
2,322 works
₹48.78 Cr sanctioned
₹34.67 Cr spent (71%)
10
Construction of Trench
1,398 works
₹48.46 Cr sanctioned
₹37.91 Cr spent (78%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 1,18,283 213.99 202.22
95%
2 Land Development 21,931 181.21 103.60
57%
3 Construction of Check Dam/Stop Dam 12,159 632.75 243.36
39%
4 Farm Pond 8,961 153.71 122.15
80%
5 Plantation 7,331 171.49 66.39
39%
6 Construction of Toilets 5,576 4.62 3.87
84%
7 Constr of Cement Concrete Roads 5,349 113.31 72.77
64%
8 Construction of Bund 4,996 73.26 57.20
78%
9 Construction of NADEP/Vermi Compost Pit 4,784 9.47 7.84
83%
10 Construction of Road and Culvert 4,545 263.77 173.65
66%
11 Solid and Liquid Waste Management 2,373 5.37 4.46
83%
12 Construction of Well 2,322 48.78 34.67
71%
13 Cattle Shed 1,946 19.59 17.41
89%
14 Construction of Trench 1,398 48.46 37.91
78%
15 Well Recharge 774 18.24 13.60
75%
16 Repair & maint of Pond/ Tank 703 16.13 13.22
82%
17 Boulder Check/Gully Plug 624 12.14 8.28
68%
18 Renovation of traditional water bodies 596 17.39 9.44
54%
19 Construction of Recharge Pits 452 4.37 3.59
82%
20 Construction of Percolation Tank 450 20.74 16.79
81%
21 Construction of Tank 436 23.17 20.28
88%
22 Construction of Crematorium 420 8.41 7.88
94%
23 Construction of Play field 364 11.46 7.42
65%
24 Goat Shelter 285 1.73 1.50
87%
25 Constr of Aganwadi 268 5.48 4.95
90%
26 Culvert 258 10.72 9.45
88%
27 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 249 8.36 7.36
88%
28 Roof Water Harvesting on gov/panchayat bldg 222 2.97 2.65
89%
29 Terracing 197 3.04 2.41
80%
30 Repair & Maint of Fish Drying Infrastructure 192 8.77 7.13
81%
31 Community Sanitary Complex 189 0.99 0.79
80%
32 Construction of Fish Drying Infrastructure 154 6.28 4.94
79%
33 Repair & maint of Water Harvesting Structures 141 6.05 5.40
89%
34 Repair & Maint of Check Dam/Stop Dam 129 3.10 2.63
85%
35 Repaire and Maint of NADEP/Vermi Compost Pit 107 0.33 0.28
86%
36 Constr of Compound wall 103 1.48 1.32
89%
37 Constr of GP Bhawan 102 5.47 3.78
69%
38 Other Works 88 1.05 0.82
78%
39 Poultry Shelter 78 0.39 0.32
82%
40 Repair & Maint of Community infrastructure 69 2.93 2.23
76%
41 Repair & maint of Percolation Tank 66 1.92 1.57
82%
42 Underground Dyke for Ground Water Recharge 61 2.68 1.56
58%
43 Repair & Maint of Bund 58 1.06 0.87
83%
44 Repair & maint of Road 56 4.60 3.24
70%
45 Construction of Embankment 50 1.95 1.66
86%
46 Constr of Food Grain storage 45 1.40 1.24
88%
47 Constr of Gabion 37 1.19 1.06
89%
48 Fish Culture 29 1.12 0.77
69%
49 Construction of Other Community Building/Assets 26 0.15 0.12
81%
50 Bio-Fertilizer 26 0.19 0.17
90%
51 Construction of building/workshed for SHG 25 1.33 1.06
79%
52 Deepening / Desilting of Flood Channels 18 4.97 0.13
3%
53 Constr of Kitchen Shed 18 0.20 0.18
93%
54 Construction of Spur 16 0.55 0.45
82%
55 Works for Flood Control and Protection 16 0.16 0.14
85%
56 Grass Land Development 14 0.50 0.30
60%
57 Nursery Development 11 0.49 0.25
50%
58 Renovation of Canal 11 0.21 0.16
73%
59 Repair & Maint of Canal 9 0.22 0.16
72%
60 Lift Irrigation 6 0.14 0.17
126%
61 Strengthening of Embankment 6 0.08 0.08
104%
62 Construction of Canal 4 0.30 0.22
73%
63 Construction of Village Haats 3 0.09 0.08
97%
64 Lining of Canal 1 0.06 0.05
86%
65 Repair & maint of Gully Plugs 1 0.04 0.03
85%
66 Piggery Shelter 1 0.00 0.00
90%
Total 2,10,218 2,166.56 1,321.69
All 66 rows (zero-value rows hidden) ⇩ Export to Excel