Showcase — Completed Works
Rollup last refreshed: 2026-08-23 08:31:42.168333
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
43 works
₹1.06 Cr sanctioned
₹1.00 Cr spent (94%)
02
Construction of Trench
16 works
₹45.48 L sanctioned
₹39.15 L spent (86%)
03
Construction of Road and Culvert
5 works
₹37.73 L sanctioned
₹26.78 L spent (71%)
04
Construction of Check Dam/Stop Dam
7 works
₹33.23 L sanctioned
₹29.60 L spent (89%)
05
Plantation
8 works
₹24.84 L sanctioned
₹4.31 L spent (17%)
06
Construction of Percolation Tank
8 works
₹20.80 L sanctioned
₹16.54 L spent (80%)
07
Rural Housing
69 works
₹13.77 L sanctioned
₹13.46 L spent (98%)
08
Farm Pond
7 works
₹12.59 L sanctioned
₹10.35 L spent (82%)
09
Constr of Cement Concrete Roads
26 works
₹12.22 L sanctioned
₹11.84 L spent (97%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹6.50 L sanctioned
₹6.54 L spent (101%)