Works completed
290
Sanctioned (pure scheme)
₹4.45 Cr
Expenditure since inception
₹4.04 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
73 works
₹1.68 Cr sanctioned
₹1.64 Cr spent (97%)
02
Construction of Road and Culvert
11 works
₹93.82 L sanctioned
₹84.62 L spent (90%)
03
Constr of Cement Concrete Roads
19 works
₹28.69 L sanctioned
₹29.19 L spent (102%)
04
Farm Pond
11 works
₹27.83 L sanctioned
₹23.60 L spent (85%)
05
Construction of Crematorium
3 works
₹25.43 L sanctioned
₹22.31 L spent (88%)
06
Rural Housing
118 works
₹21.91 L sanctioned
₹21.61 L spent (99%)
07
Plantation
8 works
₹14.64 L sanctioned
₹5.90 L spent (40%)
08
Constr of Compound wall
1 works
₹8.30 L sanctioned
₹8.00 L spent (96%)
09
Land Development
2 works
₹8.16 L sanctioned
₹7.40 L spent (91%)
10
Construction of Check Dam/Stop Dam
2 works
₹7.53 L sanctioned
₹6.34 L spent (84%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 118 0.22 0.22
99%
2 Construction of Well 73 1.68 1.64
97%
3 Constr of Cement Concrete Roads 19 0.29 0.29
102%
4 Construction of Recharge Pits 15 0.02 0.02
77%
5 Farm Pond 11 0.28 0.24
85%
6 Construction of Road and Culvert 11 0.94 0.85
90%
7 Plantation 8 0.15 0.06
40%
8 Well Recharge 7 0.07 0.06
94%
9 Construction of Tank 5 0.07 0.05
67%
10 Construction of Toilets 4 0.02 0.02
99%
11 Construction of Crematorium 3 0.25 0.22
88%
12 Boulder Check/Gully Plug 2 0.00 0.00
86%
13 Construction of Check Dam/Stop Dam 2 0.08 0.06
84%
14 Construction of NADEP/Vermi Compost Pit 2 0.00 0.00
82%
15 Construction of Play field 2 0.06 0.03
43%
16 Land Development 2 0.08 0.07
91%
17 Construction of Trench 1 0.00 0.00
96%
18 Culvert 1 0.05 0.04
86%
19 Works for Flood Control and Protection 1 0.02 0.02
86%
20 Constr of Gabion 1 0.04 0.04
94%
21 Repair & maint of Pond/ Tank 1 0.04 0.04
81%
22 Constr of Compound wall 1 0.08 0.08
96%
Total 290 4.45 4.04