Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
1,74,789
Sanctioned (pure scheme)
₹2,240.32 Cr
Expenditure since inception
₹1,769.02 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
10,526 works
₹488.11 Cr sanctioned
₹415.67 Cr spent (85%)
02
Construction of Well
25,079 works
₹363.80 Cr sanctioned
₹285.91 Cr spent (79%)
03
Construction of Percolation Tank
3,179 works
₹363.16 Cr sanctioned
₹328.08 Cr spent (90%)
04
Construction of Road and Culvert
3,425 works
₹286.92 Cr sanctioned
₹210.99 Cr spent (74%)
05
Rural Housing
98,166 works
₹173.31 Cr sanctioned
₹159.93 Cr spent (92%)
06
Construction of Trench
1,904 works
₹102.52 Cr sanctioned
₹74.66 Cr spent (73%)
07
Plantation
4,633 works
₹92.93 Cr sanctioned
₹32.40 Cr spent (35%)
08
Constr of Cement Concrete Roads
2,374 works
₹56.64 Cr sanctioned
₹37.72 Cr spent (67%)
09
Land Development
2,740 works
₹48.61 Cr sanctioned
₹24.08 Cr spent (50%)
10
Farm Pond
1,989 works
₹37.64 Cr sanctioned
₹25.15 Cr spent (67%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 98,166 173.31 159.93
92%
2 Construction of Well 25,079 363.80 285.91
79%
3 Construction of Check Dam/Stop Dam 10,526 488.11 415.67
85%
4 Plantation 4,633 92.93 32.40
35%
5 Cattle Shed 3,738 31.17 26.96
87%
6 Construction of Road and Culvert 3,425 286.92 210.99
74%
7 Construction of Bund 3,379 29.48 21.52
73%
8 Construction of Percolation Tank 3,179 363.16 328.08
90%
9 Construction of Toilets 2,804 3.18 2.17
69%
10 Land Development 2,740 48.61 24.08
50%
11 Constr of Cement Concrete Roads 2,374 56.64 37.72
67%
12 Well Recharge 2,066 22.75 18.59
82%
13 Farm Pond 1,989 37.64 25.15
67%
14 Construction of Trench 1,904 102.52 74.66
73%
15 Construction of Recharge Pits 1,384 6.68 2.81
42%
16 Construction of NADEP/Vermi Compost Pit 1,142 2.68 1.89
71%
17 Goat Shelter 925 4.72 3.51
74%
18 Construction of Crematorium 700 14.51 13.03
90%
19 Poultry Shelter 669 3.63 2.28
63%
20 Renovation of traditional water bodies 610 3.54 2.00
56%
21 Repair & maint of Pond/ Tank 552 9.13 7.40
81%
22 Construction of Play field 449 9.80 6.58
67%
23 Boulder Check/Gully Plug 372 3.49 2.53
73%
24 Community Sanitary Complex 196 1.01 0.68
68%
25 Terracing 182 0.73 0.58
79%
26 Construction of Tank 169 14.66 13.31
91%
27 Constr of Gabion 133 1.92 1.56
82%
28 Constr of Compound wall 131 10.34 8.59
83%
29 Repair & maint of Percolation Tank 116 4.95 4.40
89%
30 Constr of GP Bhawan 116 14.17 8.25
58%
31 Culvert 114 7.81 6.68
86%
32 Constr of Aganwadi 109 2.65 2.11
80%
33 Constr of Kitchen Shed 99 0.64 0.49
77%
34 Roof Water Harvesting on gov/panchayat bldg 81 0.56 0.48
86%
35 Solid and Liquid Waste Management 74 0.39 0.27
70%
36 Underground Dyke for Ground Water Recharge 55 5.38 4.36
81%
37 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 53 0.62 0.50
80%
38 Repair & Maint of Check Dam/Stop Dam 52 1.31 1.11
85%
39 Other Works 40 1.00 0.46
46%
40 Repair & maint of Road 37 3.56 2.92
82%
41 Grass Land Development 36 1.44 0.81
56%
42 Nursery Development 32 0.51 0.23
45%
43 Construction of building/workshed for SHG 23 0.66 0.58
89%
44 Repair & Maint of Community infrastructure 23 1.31 0.84
64%
45 Works for Flood Control and Protection 18 2.08 0.75
36%
46 Repair & maint of Water Harvesting Structures 16 0.32 0.24
76%
47 Constr of Food Grain storage 14 0.54 0.50
93%
48 Repair & Maint of Bund 11 0.21 0.21
96%
49 Piggery Shelter 10 0.10 0.09
91%
50 Construction of Embankment 9 0.61 0.57
94%
51 Deepening / Desilting of Flood Channels 7 0.36 0.24
66%
52 Construction of Other Community Building/Assets 6 0.05 0.04
88%
53 Bio-Fertilizer 5 0.09 0.05
61%
54 Strengthening of Embankment 4 1.32 0.69
52%
55 Repaire and Maint of NADEP/Vermi Compost Pit 3 0.19 0.18
94%
56 Construction of Canal 3 0.14 0.13
90%
57 Construction of Fish Drying Infrastructure 3 0.05 0.04
84%
58 Construction of Village Haats 2 0.06 0.05
96%
59 Lining of Canal 1 0.05 0.04
83%
60 Construction of Spur 1 0.14 0.14
99%
Total 1,74,789 2,240.32 1,769.02
All 60 rows (zero-value rows hidden) ⇩ Export to Excel