MGNREGA Works Dashboard
MGNREGA VBGRAMG MGNREGA + VBGRAMG
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-09-06 07:04:10.165253
to
to
Reset filters
Scope
Works completed
244
Sanctioned (pure scheme)
₹3.62 Cr
Expenditure since inception
₹3.33 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
9 works
₹99.63 L sanctioned
₹1.04 Cr spent (105%)
02
Constr of Cement Concrete Roads
8 works
₹78.46 L sanctioned
₹79.16 L spent (101%)
03
Construction of Trench
14 works
₹50.66 L sanctioned
₹42.43 L spent (84%)
04
Rural Housing
160 works
₹32.86 L sanctioned
₹30.06 L spent (91%)
05
Construction of Check Dam/Stop Dam
4 works
₹23.66 L sanctioned
₹23.46 L spent (99%)
06
Plantation
7 works
₹17.31 L sanctioned
₹5.78 L spent (33%)
07
Farm Pond
10 works
₹12.94 L sanctioned
₹10.21 L spent (79%)
08
Construction of Bund
6 works
₹11.19 L sanctioned
₹9.05 L spent (81%)
09
Terracing
2 works
₹10.05 L sanctioned
₹6.72 L spent (67%)
10
Construction of Tank
2 works
₹7.15 L sanctioned
₹6.12 L spent (85%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 160 0.33 0.30
92%
2 Construction of Trench 14 0.51 0.42
84%
3 Farm Pond 10 0.13 0.10
79%
4 Construction of Road and Culvert 9 1.00 1.04
105%
5 Constr of Cement Concrete Roads 8 0.78 0.79
101%
6 Land Development 7 0.05 0.03
65%
7 Plantation 7 0.17 0.06
33%
8 Construction of Bund 6 0.11 0.09
81%
9 Construction of Check Dam/Stop Dam 4 0.24 0.23
99%
10 Construction of NADEP/Vermi Compost Pit 3 0.01 0.01
90%
11 Roof Water Harvesting on gov/panchayat bldg 2 0.00 0.00
127%
12 Goat Shelter 2 0.01 0.00
1%
13 Terracing 2 0.10 0.07
67%
14 Construction of Tank 2 0.07 0.06
86%
15 Construction of building/workshed for SHG 1 0.02 0.02
98%
16 Construction of Percolation Tank 1 0.03 0.03
99%
17 Construction of Toilets 1 0.01 0.00
68%
18 Culvert 1 0.01 0.01
103%
19 Deepening / Desilting of Flood Channels 1 0.00 0.00
96%
20 Construction of Crematorium 1 0.02 0.03
171%
21 Repair & maint of Pond/ Tank 1 0.02 0.01
66%
22 Constr of Kitchen Shed 1 0.00 0.00
82%
Total 244 3.62 3.33
All 22 rows (zero-value rows hidden) ⇩ Export to Excel