Showcase — Completed Works

Rollup last refreshed: 2026-09-10 07:02:43.339169
to
to
Reset filters
Scope
Works completed
219
Sanctioned (pure scheme)
₹2.98 Cr
Expenditure since inception
₹2.57 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Land Development
5 works
₹68.92 L sanctioned
₹68.84 L spent (100%)
02
Constr of Cement Concrete Roads
22 works
₹60.19 L sanctioned
₹59.79 L spent (99%)
03
Construction of Road and Culvert
18 works
₹43.62 L sanctioned
₹45.70 L spent (105%)
04
Construction of Percolation Tank
10 works
₹36.12 L sanctioned
₹15.95 L spent (44%)
05
Rural Housing
99 works
₹20.19 L sanctioned
₹19.26 L spent (95%)
06
Plantation
8 works
₹16.29 L sanctioned
₹7.05 L spent (43%)
07
Renovation of traditional water bodies
2 works
₹13.22 L sanctioned
₹10.80 L spent (82%)
08
Construction of Check Dam/Stop Dam
10 works
₹10.41 L sanctioned
₹8.06 L spent (77%)
09
Construction of Trench
3 works
₹5.14 L sanctioned
₹3.51 L spent (68%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹4.59 L sanctioned
₹1.39 L spent (30%)

Detailed breakdown (All amounts in ₹ Lakh)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 99 20.19 19.26
95%
2 Constr of Cement Concrete Roads 22 60.19 59.79
99%
3 Construction of Road and Culvert 18 43.62 45.70
105%
4 Construction of Percolation Tank 10 36.12 15.95
44%
5 Construction of Check Dam/Stop Dam 10 10.41 8.06
77%
6 Construction of Recharge Pits 10 1.15 1.01
88%
7 Plantation 8 16.29 7.05
43%
8 Construction of Toilets 7 0.84 0.84
101%
9 Construction of Bund 6 0.00 0.29
0%
10 Land Development 5 68.92 68.84
100%
11 Solid and Liquid Waste Management 4 2.40 2.32
97%
12 Construction of Trench 3 5.14 3.51
68%
13 Renovation of traditional water bodies 2 13.22 10.80
82%
14 Roof Water Harvesting on gov/panchayat bldg 2 0.11 0.09
86%
15 Construction of NADEP/Vermi Compost Pit 2 0.30 0.30
100%
16 Construction of Crematorium 2 3.80 3.83
101%
17 Farm Pond 2 3.12 1.99
64%
18 Works for Flood Control and Protection 1 0.26 0.25
97%
19 Constr of Food Grain storage 1 1.50 0.89
59%
20 Construction of Tank 1 3.22 1.39
43%
21 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 1 4.59 1.39
30%
22 Culvert 1 2.69 2.68
100%
23 Repair & maint of Pond/ Tank 1 0.38 0.37
98%
24 Underground Dyke for Ground Water Recharge 1 0.00 0.13
0%
Total 219 298.46 256.74
All 24 rows (zero-value rows hidden) ⇩ Export to Excel