MGNREGA Works Dashboard
Admin login

Showcase — Completed Works

Rollup last refreshed: 2026-07-11 02:05:34.314168
to
to
Reset filters
Scope
Works completed
2,74,200
Sanctioned (pure scheme)
₹3,253.99 Cr
Expenditure since inception
₹2,406.86 Cr

Top new work types

Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
25,706 works
₹603.93 Cr sanctioned
₹495.56 Cr spent (82%)
02
Plantation
22,373 works
₹519.21 Cr sanctioned
₹206.76 Cr spent (40%)
03
Construction of Road and Culvert
5,354 works
₹422.88 Cr sanctioned
₹298.36 Cr spent (71%)
04
Construction of Percolation Tank
6,077 works
₹355.01 Cr sanctioned
₹311.45 Cr spent (88%)
05
Rural Housing
1,40,264 works
₹281.47 Cr sanctioned
₹238.85 Cr spent (85%)
06
Construction of Well
11,759 works
₹239.95 Cr sanctioned
₹208.08 Cr spent (87%)
07
Construction of Trench
3,662 works
₹130.29 Cr sanctioned
₹102.62 Cr spent (79%)
08
Construction of Tank
2,723 works
₹121.20 Cr sanctioned
₹105.48 Cr spent (87%)
09
Constr of Cement Concrete Roads
8,053 works
₹106.53 Cr sanctioned
₹80.83 Cr spent (76%)
10
Farm Pond
6,385 works
₹79.23 Cr sanctioned
₹57.94 Cr spent (73%)

Detailed breakdown (All amounts in ₹ Crore)

By District / Block / Panchayat By New Work Type
Sr. New Work Type Completed Sanctioned Expenditure Exp. %
1 Rural Housing 1,40,264 281.47 238.85
85%
2 Construction of Check Dam/Stop Dam 25,706 603.93 495.56
82%
3 Plantation 22,373 519.21 206.76
40%
4 Construction of Well 11,759 239.95 208.08
87%
5 Land Development 9,944 64.17 40.06
62%
6 Construction of Toilets 9,703 24.53 19.69
80%
7 Constr of Cement Concrete Roads 8,053 106.53 80.83
76%
8 Farm Pond 6,385 79.23 57.94
73%
9 Construction of Percolation Tank 6,077 355.01 311.45
88%
10 Construction of Road and Culvert 5,354 422.88 298.36
71%
11 Solid and Liquid Waste Management 3,733 12.12 8.14
67%
12 Construction of Trench 3,662 130.29 102.62
79%
13 Construction of Bund 3,312 36.50 28.78
79%
14 Cattle Shed 3,089 27.13 22.61
83%
15 Construction of Tank 2,723 121.20 105.48
87%
16 Well Recharge 1,821 29.90 24.68
83%
17 Construction of Recharge Pits 1,735 16.66 11.72
70%
18 Construction of NADEP/Vermi Compost Pit 1,173 3.39 2.11
62%
19 Boulder Check/Gully Plug 1,085 18.22 14.25
78%
20 Repair & maint of Pond/ Tank 827 12.12 9.79
81%
21 Goat Shelter 621 4.60 3.68
80%
22 Construction of Crematorium 586 12.53 11.05
88%
23 Construction of Water Drain/Diversion Channel/Drainage/Field Channel 438 16.27 8.12
50%
24 Roof Water Harvesting on gov/panchayat bldg 351 4.91 3.93
80%
25 Renovation of traditional water bodies 314 4.35 3.39
78%
26 Constr of GP Bhawan 303 16.91 14.12
84%
27 Repair & maint of Percolation Tank 296 16.72 14.96
90%
28 Constr of Gabion 254 8.08 6.60
82%
29 Construction of Play field 232 5.46 3.51
64%
30 Constr of Aganwadi 225 5.58 4.73
85%
31 Works for Flood Control and Protection 205 4.25 3.39
80%
32 Community Sanitary Complex 194 1.28 0.89
69%
33 Repair & Maint of Check Dam/Stop Dam 170 9.21 8.08
88%
34 Other Works 114 1.02 0.51
49%
35 Terracing 107 2.22 1.73
78%
36 Constr of Compound wall 97 5.25 4.19
80%
37 Culvert 94 3.41 3.01
88%
38 Repair & maint of Water Harvesting Structures 89 2.32 1.91
83%
39 Underground Dyke for Ground Water Recharge 89 3.57 3.10
87%
40 Repair & maint of Road 86 5.67 5.08
90%
41 Grass Land Development 65 2.20 1.41
64%
42 Constr of Kitchen Shed 59 0.23 0.15
65%
43 Constr of Food Grain storage 59 2.51 2.08
83%
44 Nursery Development 51 3.05 2.61
86%
45 Strengthening of Embankment 50 1.31 1.00
76%
46 Repair & Maint of Community infrastructure 37 1.27 0.94
75%
47 Bio-Fertilizer 34 0.17 0.12
72%
48 Repair & Maint of Bund 32 0.50 0.38
77%
49 Construction of Spur 31 1.79 1.68
94%
50 Poultry Shelter 30 0.15 0.13
85%
51 Repaire and Maint of NADEP/Vermi Compost Pit 26 0.23 0.19
81%
52 Deepening / Desilting of Flood Channels 19 0.35 0.44
127%
53 Construction of building/workshed for SHG 14 0.22 0.20
91%
54 Construction of Fish Drying Infrastructure 13 0.19 0.14
72%
55 Construction of Other Community Building/Assets 13 0.81 0.74
91%
56 Construction of Embankment 9 0.75 0.69
93%
57 Piggery Shelter 5 0.07 0.04
54%
58 Construction of Village Haats 4 0.03 0.03
101%
59 Lining of Canal 2 0.06 0.05
90%
60 Construction of Canal 2 0.05 0.04
75%
61 Bio-gas plant 1 0.00 0.00
66%
62 Renovation of Canal 1 0.01 0.01
100%
Total 2,74,200 3,253.99 2,406.86
All 62 rows (zero-value rows hidden) ⇩ Export to Excel